Service / 03
Evidence Handoff Micro-Assessment
A focused assessment for organizations that know an evidence handoff is unreliable but need to define the receiving authority, requirements, baseline, and pilot boundary before building.
The workflow challenge
Start with the problem and the evidence.
Teams may agree that a handoff is painful while disagreeing about what must be present, who may release it, how success will be measured, or which source records are authoritative.
When this work fits
Signals that it is time to act.
- 01The same evidence package is rebuilt for every recipient.
- 02Acceptance requirements live in email, tribal knowledge, or disconnected documents.
- 03The sender and recipient disagree about completeness or context.
- 04The organization wants a bounded pilot rather than an enterprise replacement.
What the engagement includes
A controlled path from problem to proof.
- Sender, recipient, authority, and workflow mapping
- Acceptance requirement and source-record inventory
- Baseline effort, defect, delay, and rework measures
- Pilot boundary, profile concept, and transition gate
What remains after the work
Useful output your team can own.
- 01Current-state handoff map
- 02Draft acceptance profile and gap register
- 03Approved sample-data plan
- 04Scoped pilot recommendation with measurable exit criteria
A strong starting point
The conditions for useful work.
- Both a sender and a receiving authority can participate.
- The workflow is repeated often enough to measure.
- The client is willing to provide a sanitized structure or approved sample path.
Start with one repeated problem
Determine whether it is ready for a working proof.
Phone or video · connection details confirmed by email
